BustedLoops

Current Star Citizen workarounds and hidden opportunities.

We focus on the situations where the obvious answer isn't enough.

Latest Intel

Tracking Alpha 4.10.x LIVE· Each item carries its own checked or market date

ISSUEBEST CURRENT ACTIONIroncladOperations SeatFlight Controls

Ironclad operations seat cannot use jump or zoom after a Command Module handoff

Try the middle-mouse mode switch for the exact operations-seat handoff state; it has Moderate support from one current success observation.

ISSUEBEST CURRENT ACTIONMiningRefined OreCommodity terminals

Refined ore sale fails when using Max

Select SCU amounts instead of Max first. If the sale still fails, stop for that material and terminal.

OPPORTUNITYConditionalAudio-Visual Equipment19 SCU suggested load75.97% return

Audio-Visual Equipment: Seer's Canyon to HDMS-Bezdek

360.9K aUEC expected gross profit · 475.1K aUEC cash needed. The recorded prices put 360,924 aUEC expected gross profit against a 475,076 aUEC cash commitment for a 19 SCU load. Pyro-to-Stanton travel and sale acceptance remain unverified.

ISSUEBEST CURRENT ACTIONHull-ACargo spindlesShip retrieval

Hull-A retrieval fails with cargo spindles extended

Fully retract the spindles before storing the Hull-A; no supported recovery is established once the ship returns unusable.

ISSUECURRENT CONCLUSIONIroncladShip RetrievalCargo

Ironclad body missing after retrieval

No reliable workaround is currently supported.

ISSUEBEST CURRENT ACTIONFlight ControlsVelocity LimiterForward Thrust

Velocity limiter: ship cannot maintain forward thrust

For the velocity-limiter symptom, releasing and pressing forward thrust again is the current action to try; it has Limited support and does not cover other no-thrust states.

OPPORTUNITYConditionalQuartz32 SCU suggested load82.19% return

Quartz: Shubin Mining Facility SM0-10 to Admin - Pyro Gateway

78K aUEC expected gross profit · 94.8K aUEC cash needed. This 32 SCU load pairs 77,952 aUEC expected gross profit with a 94,848 aUEC cash commitment.

OPPORTUNITYConditionalSunset Berries1 SCU suggested load49.33% return

Sunset Berries: Shepherd's Rest to Sacren's Plot

32.4K aUEC expected gross profit · 65.6K aUEC cash needed. This is a small 1 SCU load with 32,374 aUEC expected gross profit against a 65,626 aUEC cash commitment.

ISSUEFALLBACK ONLYLinuxNobaraCrashes

Star Citizen fails during PU loading or hangar traversal on Linux/Nobara

A physical swapfile alongside zram is a limited-support fallback when memory pressure or a host limit is relevant.

ISSUEBEST CURRENT ACTIONGraphicsShipsTerrain

Distant terrain does not render cleanly from inside a ship

Enter r.TSR=0 for the matching in-ship smear, then compare the same view; expect more shimmer or aliasing because temporal antialiasing is disabled.

ISSUEBEST CURRENT ACTIONMiningGemsCommodity terminals

Hand-mined gems cannot be sold at a commodity terminal

Try a small sale from your personal inventory first, with your character selected; confirm payment before moving the rest of the haul.

ISSUEFALLBACK ONLYAurora Mk IShip RetrievalASOP

Aurora Mk I cannot be retrieved after Alpha 4.9

Try one alternate-location retrieval or stock-layout claim if the warning is acceptable; Aurora-specific recovery remains unconfirmed.

OPPORTUNITYConditionalHephaestanite30 SCU suggested load81.65% return

Hephaestanite: Admin - Rod's Fuel 'N Supplies to Admin - CRU-L4

80.9K aUEC expected gross profit · 99.1K aUEC cash needed. This route pairs 80,910 aUEC expected gross profit with a 30 SCU load and a cash requirement just under 100,000 aUEC.

OPPORTUNITYConditionalNeon6 SCU suggested load61.82% return

Neon: Ashland to Devlin Scrap and Salvage

57.3K aUEC expected gross profit · 92.7K aUEC cash needed. This keeps the cargo commitment small while retaining material expected gross profit on less than 100,000 aUEC of capital.

OPPORTUNITYConditionalGasping Weevil Eggs2 SCU suggested load72.38% return

Gasping Weevil Eggs: Fallow Field to Brio's Breaker Yard

67.2K aUEC expected gross profit · 92.8K aUEC cash needed. This route produces meaningful absolute expected gross profit from only 2 SCU of cargo.